[{"data":1,"prerenderedAt":294},["ShallowReactive",2],{"site-header-common":3,"site-footer-common":59,"site-navigation-common":86,"guidance:calculation-methodology":113},{"id":4,"extension":5,"footer":6,"meta":50,"navbar":51,"stem":57,"__hash__":58},"common\u002Fcommon.yml","yml",{"tagline":7,"legalTitle":8,"cookieSettingsLabel":9,"links":10,"sections":11},"Acoustic cleaning intelligence for industrial fouling, soot, ash, dust and build-up.","Legal","Cookie preferences",[],[12,24,36,48],{"title":13,"links":14},"Product",[15,18,21],{"label":16,"to":17},"How it works","\u002F#how-it-works",{"label":19,"to":20},"Application fit","\u002F#fit",{"label":22,"to":23},"ROI calculator \u002F Coming soon","\u002F#economics",{"title":25,"links":26},"Applications",[27,30,33],{"label":28,"to":29},"Boilers and heat transfer","\u002Fapplications\u002Fboilers-heat-transfer",{"label":31,"to":32},"SCR catalyst cleaning","\u002Fapplications\u002Fscr-catalyst-cleaning",{"label":34,"to":35},"Dust collection","\u002Fapplications\u002Fdust-collection",{"title":37,"links":38},"Resources",[39,42,45],{"label":40,"to":41},"Blog","\u002Fresources\u002Fblog",{"label":43,"to":44},"Glossary","\u002Fglossary",{"label":46,"to":47},"Buyer's guide","\u002Fresources\u002Fblog\u002Facoustic-cleaning-system",{"title":8,"links":49},[],{},{"links":52,"action":56},[53,55],{"label":25,"to":54},"\u002F#applications",{"label":16,"to":17},{"label":22,"to":23},"common","rzKP9GVWGTSjN3RTtCIYeR1oX7iQIvlngM7hHP108rc",{"id":4,"extension":5,"footer":60,"meta":80,"navbar":81,"stem":57,"__hash__":58},{"tagline":7,"legalTitle":8,"cookieSettingsLabel":9,"links":61,"sections":62},[],[63,68,73,78],{"title":13,"links":64},[65,66,67],{"label":16,"to":17},{"label":19,"to":20},{"label":22,"to":23},{"title":25,"links":69},[70,71,72],{"label":28,"to":29},{"label":31,"to":32},{"label":34,"to":35},{"title":37,"links":74},[75,76,77],{"label":40,"to":41},{"label":43,"to":44},{"label":46,"to":47},{"title":8,"links":79},[],{},{"links":82,"action":85},[83,84],{"label":25,"to":54},{"label":16,"to":17},{"label":22,"to":23},{"id":4,"extension":5,"footer":87,"meta":107,"navbar":108,"stem":57,"__hash__":58},{"tagline":7,"legalTitle":8,"cookieSettingsLabel":9,"links":88,"sections":89},[],[90,95,100,105],{"title":13,"links":91},[92,93,94],{"label":16,"to":17},{"label":19,"to":20},{"label":22,"to":23},{"title":25,"links":96},[97,98,99],{"label":28,"to":29},{"label":31,"to":32},{"label":34,"to":35},{"title":37,"links":101},[102,103,104],{"label":40,"to":41},{"label":43,"to":44},{"label":46,"to":47},{"title":8,"links":106},[],{},{"links":109,"action":112},[110,111],{"label":25,"to":54},{"label":16,"to":17},{"label":22,"to":23},{"id":114,"title":115,"body":116,"description":268,"extension":269,"eyebrow":270,"meta":271,"navigation":272,"path":273,"primary":274,"relatedLinks":275,"seo":285,"stem":288,"summary":289,"__hash__":293},"guidance\u002Fguidance\u002Fcalculation-methodology.md","Calculation methodology",{"type":117,"value":118,"toc":250},"minimark",[119,124,128,131,135,140,143,147,150,154,157,161,164,168,171,175,178,213,216,220,223,226,230,233,236,240,243,247],[120,121,123],"h2",{"id":122},"status-and-purpose","Status and purpose",[125,126,127],"p",{},"The calculator is planned. This page defines the intended public method so that its assumptions can be reviewed before launch. It does not currently calculate a result or provide a price.",[125,129,130],{},"The calculation will estimate the present cost of a recurring, measurable fouling problem and explore avoided-cost scenarios only after the application-fit screen.",[120,132,134],{"id":133},"cost-categories","Cost categories",[136,137,139],"h3",{"id":138},"lost-production-and-derate","Lost production and derate",[125,141,142],{},"Estimate load, throughput or contribution margin affected by deposit-related restrictions and cleaning stops. Use an operating basis agreed by the plant, and keep avoided production distinct from revenue.",[136,144,146],{"id":145},"offline-and-manual-cleaning","Offline and manual cleaning",[125,148,149],{},"Include direct labour, contractors, isolation, access, scaffolding, washing, lancing, waste handling and the production effect of cleaning time where those costs are documented.",[136,151,153],{"id":152},"existing-cleaning-medium-and-wear","Existing cleaning medium and wear",[125,155,156],{},"Include relevant steam, compressed air, water, consumables, maintenance and wear. Do not assume that another cleaning system disappears unless the application scope explicitly supports that change.",[136,158,160],{"id":159},"efficiency-and-pressure-loss","Efficiency and pressure loss",[125,162,163],{},"Use measured heat rate, fuel use, temperature, fan power or pressure data where available. Avoid universal efficiency or fuel-saving percentages.",[136,165,167],{"id":166},"proposed-system-costs","Proposed-system costs",[125,169,170],{},"The eventual comparison may include provisional equipment, controls, air treatment, receiver capacity, mounting, engineering, freight, installation, commissioning, maintenance and operating air. Inclusions and exclusions must be visible.",[120,172,174],{"id":173},"input-status","Input status",[125,176,177],{},"Every value should carry one label:",[179,180,181,189,195,201,207],"ul",{},[182,183,184,188],"li",{},[185,186,187],"strong",{},"Supplied fact:"," visitor-provided measurement or commercial value.",[182,190,191,194],{},[185,192,193],{},"Visitor estimate:"," a judgement supplied by the visitor.",[182,196,197,200],{},[185,198,199],{},"Sylio default:"," a sourced value selected by the method.",[182,202,203,206],{},[185,204,205],{},"Scenario assumption:"," an explicit conservative or upside case.",[182,208,209,212],{},[185,210,211],{},"Unknown:"," missing information that lowers confidence.",[125,214,215],{},"The result should allow a reader to inspect and revise these values without searching through hidden calculation logic.",[120,217,219],{"id":218},"scenarios-and-sensitivity","Scenarios and sensitivity",[125,221,222],{},"The result should separate a conservative case from any upside scenario. It should identify the assumption with the largest effect on the result and show how missing evidence could change fit, scope or payback.",[125,224,225],{},"Simple payback may be shown where the cost basis is adequate, but it should not replace lifecycle operating cost, risk or the plant's own capital criteria.",[120,227,229],{"id":228},"estimate-language","Estimate language",[125,231,232],{},"The intended output is a concept-screening or indicative order-of-magnitude estimate. Visual precision does not increase estimate maturity. Accuracy depends on the definition of the application, reference data, location, market conditions, installation scope and risk.",[125,234,235],{},"Public estimate terminology and uncertainty language require cost-engineering and legal review before launch. A fixed accuracy band should not be published without that validation.",[120,237,239],{"id":238},"exclusions","Exclusions",[125,241,242],{},"Unless explicitly included, a screening result does not establish detailed design, structural work, hazardous-area compliance, noise treatment, installation labour, outage plan, tax, duty, freight, commissioning, site acceptance or a guaranteed operating result.",[120,244,246],{"id":245},"versioning","Versioning",[125,248,249],{},"The launched methodology should publish a version, calculation date, formula definitions, default sources and change record. The quotation preview should preserve the version and assumptions used to produce it.",{"title":251,"searchDepth":252,"depth":252,"links":253},"",2,[254,255,263,264,265,266,267],{"id":122,"depth":252,"text":123},{"id":133,"depth":252,"text":134,"children":256},[257,259,260,261,262],{"id":138,"depth":258,"text":139},3,{"id":145,"depth":258,"text":146},{"id":152,"depth":258,"text":153},{"id":159,"depth":258,"text":160},{"id":166,"depth":258,"text":167},{"id":173,"depth":252,"text":174},{"id":218,"depth":252,"text":219},{"id":228,"depth":252,"text":229},{"id":238,"depth":252,"text":239},{"id":245,"depth":252,"text":246},"See the cost categories, input labels, confidence treatment and estimate boundaries intended for Sylio's planned ROI assessment.","md","Guidance \u002F Planned methodology",{},true,"\u002Fguidance\u002Fcalculation-methodology",null,[276,279,282],{"label":277,"to":278},"ROI and payback guide","\u002Fresources\u002Fblog\u002Facoustic-cleaning-roi-payback",{"label":280,"to":281},"How the assessment works","\u002Fguidance\u002Fhow-the-assessment-works",{"label":283,"to":284},"Quotation preview explainer","\u002Fguidance\u002Fquotation-preview",{"title":286,"description":287},"Sylio planned ROI calculation methodology","Understand the planned cost categories, assumptions, confidence, exclusions and estimate limits behind Sylio's acoustic-cleaning ROI assessment.","guidance\u002Fcalculation-methodology",[290,291,292],"The calculation starts from documented current cost, not a promised percentage saving.","Visitor facts, estimates, sourced defaults, scenario assumptions and unknowns remain separate.","The public methodology will be versioned and reviewed before the calculator launches.","YAgVchxAeasdtec8JnjAsLMZQAwiHHJkvskKMABPbA0",1784218412603]